URGENT: PM Surya Ghar Muft Bijli Yojana officially closes on March 31, 2027. Apply now to secure your ₹78,000 subsidy! The 1 Crore installation target is filling fast. Beat the DISCOM queue and lock in your free electricity today. Click here to read the official deadline details and download guidelines.
9666088988, 8466088988
Serving All Telangana (HQ: Kothagudem)
Important Deadline Update

PM Surya Ghar Yojana Closes in March 2027!

The clock is ticking on the ₹78,000 solar subsidy. Secure your free electricity before the scheme ends.

Last Updated: August 2026 By Nature Power Solar Team Government Schemes

The PM Surya Ghar Muft Bijli Yojana has been a game-changer for homeowners in Telangana, allowing thousands to slash their electricity bills. However, this golden opportunity is not permanent. The Government of India has officially confirmed that the scheme, backed by a ₹75,021 crore budget to solarize 1 crore households, will strictly close on March 31, 2027.

Official Government Guidelines

Want to read the exact scheme rules and timeline? You can download the official Ministry of New and Renewable Energy (MNRE) guidelines document below.

Download Official Announcement

What Happens After March 31, 2027?

Once the deadline passes or the 1-crore installation target is met (whichever comes first), the current subsidy structure will end. If you delay, you face several risks:

  • Losing the ₹78,000 Subsidy: The central financial assistance (up to ₹78,000 for a 3kW system) is tied to this specific deadline. After this, you may have to bear the full cost of rooftop solar installations.
  • Longer DISCOM Queues: As the deadline approaches, a massive rush of late applicants will severely delay TGNPDCL/TSSPDCL net-metering approvals and site inspections.
  • Vendor Availability: Government-empanelled vendors will be booked out months in advance during the final rush.

Why You Must Act Now (2026 is the Sweet Spot)

Right now, the process is streamlined. At Nature Power Solar, we are currently seeing average processing times of 60 to 90 days from portal registration to the subsidy hitting your bank account. By starting your application today, you ensure a smooth, stress-free installation well before the inevitable panic of early 2027.

  1. Instant Registration: We immediately register your application on the National Portal for Rooftop Solar.
  2. Feasibility Approval: We expedite the DISCOM site inspection.
  3. Quick Installation: Our expert engineers install your system within days, not weeks.
  4. Subsidy Credited: We handle the documentation to ensure your subsidy is processed successfully.

Beat the Rush!

Don't let the March 2027 deadline catch you off guard. Secure your solar subsidy in Telangana today.

Apply For Subsidy Now

Check Your Subsidy

Calculate exactly how much you can save before the scheme closes.

Need Help Applying?

  • Call Us Now +91 96660 88988
  • Email Us info@naturepowersolar.com